Prestige Sunny Vista Cost Sheet
The Prestige Sunny Vista cost sheet is a plot-specific breakup of the complete amount payable by a buyer, including the base land value, preferred-location charges, infrastructure cost, clubhouse charges, maintenance deposit, applicable taxes, stamp duty and registration. It shows the difference between the advertised starting price and the final amount required to purchase and register the selected plot.
For example, ₹1.44 crore is only the base value of a 2,400 sq. ft. Type A plot at ₹6,000 per sq. ft. Its total payable cost can be calculated only after adding the charges applicable to its plot number, facing, road position and common facilities. The same method applies to the 3,000 and 4,780 sq. ft. plots and to custom-sized plots.
What Does the Prestige Sunny Vista Cost Sheet Include?
A proper Prestige Sunny Vista complete cost breakup should contain the following components.
| Cost Component | What It Covers |
| Base plot value | Plot area multiplied by ₹6,000 per sq. ft. |
| Preferred-location charge | Corner, park-facing, wider-road or premium-view position |
| Infrastructure charge | Roads, drainage, water lines, streetlights and underground electricity |
| Clubhouse and amenity charge | Access to the clubhouse, pools, sports and common facilities |
| Maintenance deposit | Initial maintenance or advance collection |
| Corpus or sinking fund | Reserve for future upkeep, if collected |
| Applicable taxes | Tax on separately billed taxable services, where applicable |
| Stamp duty | Government charge on property registration |
| Registration fee | Fee for registering the sale deed |
| Documentation charges | Legal, administrative or agreement-related costs |
| Final payable amount | Total of all applicable components |
The selected plot number, area and price should appear at the top of the cost sheet. Every additional charge must have its own line rather than being grouped under “other charges.”
How Is the Base Plot Value Calculated?
The base value is the first part of the cost sheet. It is calculated using the plot area and the current ₹6,000-per-sq.-ft. rate.
| Plot Type | Plot Area | Base-Price Calculation | Base Plot Value |
| Type A | 2,400 sq. ft. | 2,400 × ₹6,000 | ₹1.44 crore |
| Type B | 3,000 sq. ft. | 3,000 × ₹6,000 | ₹1.80 crore |
| Type C | 4,780 sq. ft. | 4,780 × ₹6,000 | ₹2.87 crore |
| Type D | Varying sizes | 6,000 × ₹6,000 | Price on request |
These amounts are not the all-inclusive prices. They are the starting values used to prepare the unit-specific cost sheet.
Sample Cost Sheet for a Type A Plot
A Type A plot measures 2,400 sq. ft. and has a base value of ₹1.44 crore. Its cost sheet should be presented in this format:
| Cost-Sheet Component | Type A Plot |
| Base land value | ₹1.44 crore |
| Corner or location premium | Based on selected plot |
| Infrastructure charge | As stated in the official cost sheet |
| Clubhouse and amenity charge | As stated in the official cost sheet |
| Maintenance deposit | Rate and collection period to be confirmed |
| Corpus fund | If applicable |
| Tax on separately billed services | If applicable |
| Stamp duty | Based on the registered property value |
| Registration fee | Based on the registered property value |
| Documentation charges | If applicable |
| Final all-inclusive cost | Total of all applicable charges |
The developer must fill in each variable amount for the allotted plot. A buyer should not accept only a base-price quotation without this complete breakup.
Preferred-Location Charges
Two plots of the same size can have different final costs because of their position within the layout.
A preferred-location charge may apply to:
- Corner plots
- Plots facing parks or open green areas
- Plots along wider internal roads
- Plots close to the clubhouse
- Custom-sized or viewpoint plots
- Plots with better access or shape
The cost sheet should state the PLC rate, the area on which it is applied and the total premium. It should not show only a combined amount without explaining the calculation.
Infrastructure and Development Charges
The base plot value may not cover every part of the layout development. A separate infrastructure charge can include:
- Plot demarcation
- Concrete internal roads
- Stormwater drainage
- Water-supply connections
- Underground electrical lines
- Streetlights
- Avenue planting
- Common utility systems
- Security and entrance infrastructure
Buyers must ask whether these charges are already included in the ₹6,000-per-sq.-ft. rate. If they are charged separately, the cost sheet should show the amount and payment stage.
Clubhouse and Amenity Charges
Prestige Sunny Vista plans a clubhouse, café, pools, gym, spa, indoor games, sports courts and landscaped common areas.
The cost sheet should clarify whether clubhouse access is:
- Included in the base plot value
- Collected as a separate one-time charge
- Subject to an annual usage fee
- Included in the maintenance charge
A buyer should also check whether every promised facility belongs to the same approved project phase.
Maintenance Deposit and Ongoing Charges
An indicative maintenance rate of ₹4 per sq. ft. has been mentioned for the project. However, the cost sheet must explain:
- The area on which ₹4 is calculated
- Whether it is monthly, annual or one-time
- How many months are collected in advance
- Whether clubhouse upkeep is included
- When regular maintenance billing begins
Without these details, the maintenance amount cannot be added correctly to the final cost.
Stamp Duty and Registration
Stamp duty and registration charges are payable during the sale-deed registration. They are separate from the developer’s base plot price.
The amount depends on the property value accepted for registration and the Karnataka government rates in force on the registration date. The cost sheet may provide an estimate, but the final statutory amount must follow the government calculation.
GST and Applicable Taxes
Sale of land is outside GST under Schedule III. However, separately billed development or amenity services can require a different tax treatment depending on the agreement structure.
The cost sheet must clearly separate:
- Land value
- Development charges
- Clubhouse or amenity charges
- Taxable services, if any
- GST rate applied to each taxable component
Buyers should not accept a single GST amount without knowing which charge it applies to.
Prestige Sunny Vista Booking and Payment Schedule
The initial Prestige Sunny Vista booking amount is 10% of the selected plot’s base value.
| Plot Type | Base Value | 10% Booking Amount |
| Type A | ₹1.44 crore | ₹14.40 lakh |
| Type B | ₹1.80 crore | ₹18 lakh |
| Type C | ₹2.87 crore | ₹28.68 lakh |
| Type D | Price on request | On request |
The remaining amount follows a development-linked payment schedule. Instalments may be connected to plot demarcation, internal roads, utilities, landscaping, common facilities and final registration.
The official cost sheet must show the percentage, amount and due date for every milestone.
Cost Sheet vs Price List
A price list shows only the starting price for each plot size. A cost sheet shows the complete financial liability for one selected plot.
| Price List | Cost Sheet |
| Gives general plot prices | Applies to a specific plot number |
| Shows the base rate | Shows every additional charge |
| Used for initial comparison | Used before booking and agreement |
| Does not show the final total | Calculates the final payable amount |
| Same for plots of equal size | Changes with location, facing and charges |
Buyers should use the price list for shortlisting and the cost sheet for the final purchase decision.
Costs Not Included in the Plot Cost Sheet
Prestige Sunny Vista sells developed villa plots, not completed villas. The plot cost sheet does not normally include:
- Architect fees
- Building-plan approval
- Villa construction
- Labour and materials
- Interior work
- Private landscaping
- Boundary wall and gate
- Construction-period electricity and water
- Future property tax
These costs must be budgeted separately after plot possession.
How to Get the Prestige Sunny Vista Cost Sheet
Submit the enquiry form and mention the preferred plot size. Ask for a cost sheet containing:
- Selected plot number
- Exact dimensions and area
- Base land value
- Preferred-location charge
- Development and amenity charges
- Maintenance and corpus deposits
- Applicable tax breakup
- Stamp-duty estimate
- Registration estimate
- Payment milestones
- Final payable amount
Also request the current inventory sheet, master plan and draft agreement. All three documents should show the same plot number and area.
FAQs
1. What is the Prestige Sunny Vista cost sheet?
It is a detailed statement showing the base land value and every charge payable for a selected plot, including location, infrastructure, amenities, maintenance, taxes and registration.
2. Is the starting plot price the final cost?
No. The starting price covers the base plot value. The final cost is calculated after adding all plot-specific, project and statutory charges.
3. What is included in the all-inclusive plot cost?
It includes the base land price, location premium, development charges, amenity costs, deposits, applicable taxes, stamp duty and registration.
4. Why can two equal-sized plots have different costs?
Corner position, road width, park view, plot shape and clubhouse proximity can attract different preferred-location charges.
5. Does the cost sheet include villa construction?
No. Villa design, approval and construction are separate from the plotted-development cost sheet.
6. When should a buyer request the cost sheet?
A buyer should request it before paying the booking amount and again before signing the agreement to confirm that no charge has changed.